Facilities
In April of 2026, the Bulldogs completed construction on their new $2m Team House directly behind the home dugout. The facility is top of the line in every aspect. At 2400 sq ft, the building is complete with a players locker room with bathrooms, a coaches locker room, a conference room for meetings, and a coaches office area. The players’ locker room is equipped with pro style wood lockers with a padded chair for each, a personal storage area, and a shoe storage area. The room also has a 90” tv mounted to the wall, 4 JBL surround sound speakers with a 10” subwoofer included, and a ping pong table with special flooring used in many NFL Locker Rooms.
In 2014, College of San Mateo's baseball field was completely remodeled.
Some of the new features include:
|
|
